Wednesday 18 December 2013

Bolton Council - New Homes Bonus

Letter to Bolton News (Not published)


Dear Sir,

May I be amongst the first to congratulate Bolton Council on its receipt of the latest tranche of the New Homes Bonus.

This is of course the money paid for each new property built in the Borough or each home brought back into use. For each property, it is equivelant to the national average Council Tax for that property band and is paid for each of the six years following the construction or renovation.

The purpose of this grant is to encourage the building of new homes and will help the Council achieve the necessary target of building 700 plus homes for each of the years up to 2025.

Bearing this in mind, it was puzzling that more effort was not put into achieving the building of the 88 dwellings on a plot of land in Little Lever for which planning permission had been given.

This would have produced over six years a bonus of some £600,000 plus Section 106 monies of £238,000 for that development let alone the ongoing Council Tax receipts.

Instead, in their wisdom, the Council chose to promote the more controversial £5m supermarket scheme which on completion will produce Sec 106 monies of £30,000.

Which would you have chosen?

Notwithstanding all this, I hope I am not stating the obvious by recommending that the £8.4m received so far should not be absorbed into the black hole of general Council expenditure, but be used to construct further affordable homes thus attracting even more bonuses.

At a rough estimate, using land already owned by the Council, £8.2m would build another 136 homes.

Paul Richardson
Ripon Close
Little Lever

Friday 6 December 2013

Letters update - Bolton Council Planning Process is 'Bent'? - 6th Dec 2013 (Not yet published)







Dear Sir,

May I commiserate with Councillor Morgan following his failed attempt to establish an investigation into breaches of Planning Consents.

I wish I could say I was surprised, but the attitude of the Council is well summed up by the breathtakingly complacent statement from Councillor Morris that he didn’t think that there was a problem with the Planning system.

Oh, really?

As a member of the Planning Committee, Councillor Morgan needs to look a bit closer to home. The problem isn’t to do with Mr Smith/Patel sticking an extra couple of feet on his extension, it is to do with the Department of Development and Regeneration deciding that this or that is going to happen and bending over backwards to make sure that it happens irrespective of the rigid constraints of the Planning Process. The supine Planning Committee are complicit in this.

Without wishing to be boring, the Tesco at Little Lever application is a perfect example of this. There is still no doubt in my mind that let alone a coach and horses, a complete wagon train was driven through the requirements of the Planning Process to achieve approval. Even the stipulation of the Committee that the Traffic Arrangements be reconsidered was ignored with the result that upon completion we’ll be faced with gridlock.

Now, the proposed Middlebrook development is deferred on the pretence of traffic issues.
A more likely reason is to avoid upsetting developers Emerson who are involved with the Council’s favourite development at the Loco Works and Bluemantle who financed the Director’s recent jolly to Cannes and have spent five years not financing the Church Wharf development.

As to the rest of the town, it doesn’t take much looking around to discover the ‘successes’ of the Planning system. Odeon – Lido – make up your own list.

Finally, the passing of plans for the £48m new bus station linked to the railway station just as rail services are being reduced to a level not much above those in the film ‘The Titfield Thunderbolt.’ What vision!.

I fervently hope that the Electors of the Borough will take full advantage of next May’s Local Elections to show Councillor Morris exactly what they think of his Planning System.

Paul Richardson
Ripon Close
Little Lever.

Letters update - Local Elections 2014 - 18th October 2013





Dear Sir,


As the evenings draw in and the memories of summer fade, my thoughts are drawn towards the local elections of next May.

These will provide the first opportunity in two years for the electors of the Borough to express an opinion on how their Councillors and the Council as a whole have executed their stewardship of the well being of the town.

It would seem that measured against a multitude of indicators, the town of Bolton is falling down the league tables faster than the Wanderers.

Since all local authorities are suffering from reductions in Government funding on a broadly equal basis, the question must be asked as to why it is that our town is performing more poorly than others.

I would suggest that the answer to this is that the Leadership, the Councillors and the senior officers have become tired, sclerotic and devoid of vision and, bluntly, have run out of ideas.

There are two ways forward. One is to explore the possibility of an Elected Mayor. A petition containing some 9,000 plus names would be sufficient to trigger a referendum on this matter. The only problem would be that, as in other areas, the Leader of the Council would probably finish up as Elected Mayor rather than say a prominent and successful entrepreneur and we would thus be no further forward.

The other way is for candidates from outside the three main parties to gain a foothold in the Council chamber. After all, every journey starts with one step.

The election of independent candidates would be ideal but there may also be the prospect of UKIP candidates being put forward in selected wards to break the log jam of traditional voting patterns.

However this may turn out, if the electors vote for the status quo, then I fear that the rot will continue and this once proud town will finish up on its knees and in the gutter.

Paul Richardson
Ripon Close
Little Lever.

Letters update - Bolton Council - Ship Ahoy! - 30th August 2013 (Not published)




Dear Sir,

Perhaps others amongst your readers might, like myself, have found it somewhat unseemly that a senior Councillor and former Mayor should lower the tone of a full Council meeting by indulging in personal abuse and likening certain other Councillors to characters in the Captain Pugwash cartoons.

If members of the public were to extend the same exercise to the whole body of Bolton Councillors, they would certainly find rich pickings amongst the cast of the Muppet Show.

Just for fun, I went online to do this and within minutes had come up with over half a dozen. I couldn’t go further because I was laughing so much.

Paul Richardson
Ripon Close
Little Lever.

Letters update. Our European Boulevard. 12th August 2013




Dear Sir,

Mr Ryder’s enthusiasm for the ‘fantastic’ news of the suggested European Boulevard in Newport St would be praiseworthy if the proposal was realistic in its aims.

He does well to mention the Church Wharf, Central St, Merchant Quarter and Odeon developments but without realizing that on the admission of the Leader of the Council and the Chief Executive, these projects are going nowhere anytime soon. The reason is simple – the Private Sector is unwilling to invest the kind of money required for these in Bolton given the decline in commercial activity and the lack of footfall in the town centre.

The artist’s impression seems to be relating to Newport St between the Town Hall and the Olympus Chippy.  The report suggests that the extent of refurbishment would be once again to re-do the flags, lamp posts, street furniture and the like. £9m seems a bit steep for this but in any event none of this addresses the real problem of the lack of variety and quality of the retail offer located there.

There is no point in promenading up and down the Boulevard if there’s nowt worth buying.

All this also ignores the semi-derelict stretches of property at the Trinity St end of Bradshawgate, the former FADS and Gregory & Porritts stores on Great Moor St or the poor quality of the buildings at the Station end of Newport St. These are the things that people would see before they got to this new Boulevard and are much more worthy of money being spent on them.

The Greater Manchester Planning & Housing Commission apparently envisages Bolton as the main hub for office accommodation. Apart from wondering what the heck this has got to do with Greater Manchester, we’ve already got more empty offices than you can shake a stick at.

The ‘piece de resistance’ of this article was the Market Place manager getting excited about the ‘key role’ that the Centre would have in this plan. If he wants to have a key role, he should bite the bullet and change it back into what it used to be.

No, I’m sorry Mr Ryder, this is another load of expensive old tosh piled on top of all the previous expensive old tosh we’ve been regaled with.

Having said all that, I suppose it keeps the Development and Regeneration Department busy persuading us that the Emperor is indeed wearing some clothes.

If any or all of this comes to fruition in the next five or even ten years, I will gladly show my backside on the Town Hall steps (If it’s still there)

Paul Richardson
Ripon Close
Little Lever.

Letters update - Smoking Shelters - 6th July 2013 (Not published)





Dear Sir,

Predictably, the issue of smoking shelters at the Royal Bolton Hospital has, together with other matters at the hospital, descended into farce.

This stems from the original decision to ban smoking on the whole of the hospital site some five years ago. This ban last a fortnight until the powers that be discovered that it was illegal apart from being unenforceable.

The subsequent removal of the smoking shelters inevitably resulted in patients and visitors alike huddling round the main entrance producing a cloud of tobacco smoke that everybody else had to fight their way through.

The eminently sensible decision to re-instate the shelters away from the entrance would have solved this and allowed the smokers to poison each other to their hearts content without offending or affecting the purer living individuals who don’t smoke.

But NO!  The hairs were up on the necks of the fascist anti-smoking brigade. From the Council downwards the loins were girded, the placards written. ‘We know what’s best for you!’ ‘Off with their heads!’ ‘To the gallows!

Net result – their will be no smoking shelters. Back to the status quo.

Happy passive smoking everybody.

Paul Richardson
Ripon Close
Little Lever.

Letters update - Bolton is an Asylum Dispersal Centre - 6th July 2013








Dear Sir,

I, and no doubt others, was taken aback to discover that Bolton is designated an ‘Asylum Dispersal Area’. Apparently the Council signed up to this scheme as far back as 2004.

Putting aside the no doubt charitable motives behind this decision, it does appear to me to be strange in view of the much publicized degree of deprivation that existed in the Borough at that time – a situation which apparently still remains.

It is clear to me that this designation refers to Asylum Seekers who, by the very definition, are not allowed to work or contribute to the local economy in any way.

Following your article, many of the published remarks seem to assume that the report refers to immigration in general and their defensive remarks reflect this.

Sean Harriss remarks on the co-ordinated efforts made to ensure that new communities integrate successfully. I don’t think that integration is the problem. I think the problem is money.

My point is that there are necessarily additional cost implications for Housing Benefit, Council Tax Benefit, Education, Translation services and NHS provision etc just at a time when financial constraints mean that these areas just cannot afford it.

Perhaps it is time for the Council to ‘join out’ of this scheme in order to alleviate these additional and unnecessary pressures and let other richer and less deprived areas take our place.

Paul Richardson
Ripon Close
Little Lever.

Saturday 20 July 2013

Tesco at Little Lever. My reply to Bolton News article (see below)




Dear Sir,

Following an investigation by your reporter, Saiqa Chaudhari, into whether or not the proposed Tesco development at Little Lever was amongst the 100 plus developments axed or put on hold by that company, apparently they have gone to great lengths to assure us that this is not the case.

After all the hoo-ha surrounding the application and the bending over backwards of the Council to accommodate them, I am tempted to say ‘Well, they would say that wouldn’t they’

The truth of the matter is that thirteen months after the Planning Committee passed the buck over to the Director and nine months after he made the final decision to approve the application, not one sod has been turned nor one brick laid.

Further to this, as of today’s date and according to the Land Registry, the developer hasn’t even bought the land. Then again, if you were not intending to proceed, you wouldn’t shell out some £2m for nothing.

Another interesting point concerns the Sec 106 agreement between the Council, the landowners and the developer. Normally this would refer to an amount of money freely contributed to the local community by the developers to mitigate any negative effects of the development.

This had been mooted for this £5m development to be in the region of £20,000 to £30,000.

Unfortunately no specific sum is mentioned in the Sec 106 agreement.

If the Council had been a little less tardy in introducing the new Community Infrastructure Levy which broadly replaces Sec 106 monies, then Tesco would have been stuck with a Levy of some £233,000.  Lucky escape !.

Given, in my view, that the only benefit of this proposal would be to clean up the site, if this does not proceed in the near future, then the residents are stuck with this eyesore for who knows how long.

As some football commentator once said ‘It’s not over till it’s over’

Paul Richardson
Ripon Close
Little Lever

Keith Davies, Bolton Council's regeneration boss gets honorary degree




From the Bolton News:-


ONE of the key players in driving Bolton forward has been honoured by the University of Bolton

Keith Davies, Bolton Council's Director of Development and Regeneration, was awarded an Honorary Master for his contribution to the town of Bolton.

Mr Davies said: “I feel very proud and honoured that my work in Bolton has been recognised in this way."

Here is a picture of Mr Davies feeling very proud and honoured





..............................................................................................................................................................


Now let's look at a few examples of the Development and Regeneration around the town that Mr Davies has presided over and which demonstrates how he is " driving Bolton forward"



























 Well done Mr Davies!

Perhaps a Knighthood in the New Year's Honours is overdue.


The last picture sums it all up. Bury Council's Advert on the side wall of the Hen & Chicks pub on Deansgate.

 







Wednesday 19 June 2013

Tesco at Little Lever - Will they, Won't they ???




 

Tesco 'committed' to building new supermarket in Little Lever

Supermarket giant Tesco has dismissed rumours that plans to build a new store in Little Lever have been scrapped.

Villagers attending Monday’s Little Lever area forum said they understood that plans to develop a supermarket on the on the site of the former Pennine Pets Factory, on the corner of Lever Street and Crossley Street, had been axed.

Planning bosses granted the supermarket permission to build a 2,778sqm store just over a year ago — but work has still not started on the complex.

This week, Tesco, responding to the rumours, said they would open a new supermarket in the village.

A Tesco spokesman said: "We are committed to bringing a new and improved store to Little Lever to replace our existing Metro.”

Plans for a new Tesco were first unveiled n May 2011 and would replace the existing Tesco Metro in Market Street.

The proposals split the community with those for and against staging campaigns — and public meetings were also called.

The plans won the backing of Bolton Council, which gave Tesco permission to build the shop.

Supermarket bosses said the new store would incorporate green features including a timber frame, rainwater harvesting, and wind catchers.

It will have car parking, a service yard and landscaping, and there will also be road alterations to accommodate the increase in traffic and ease congestion.

Changes include making Lever Street one-way, widening Ainsworth Road and adding a puffin crossing, replacing Church Street’s zebra crossing with another puffin crossing, relocating the bus stops in Ainsworth Road and Market Street, and adding traffic-calming measures to Ainsworth Road and Victory Road

The existing Tesco Express, in Market Street, will close and its 49 staff will be moved to the new shop, while an extra 100 new jobs would be created.

Tesco said the new plans would regenerate a derelict site and provide a modern shopping environment for customers.

The Tesco spokesman added: “As soon as the timescale becomes clear we will update the community on our plans."

Work has to be started within three years of the plans being given permission.

Tesco at Little Lever - They're still not 'havin' it !!





Dear Mr Richardson

Thank you for your letter. I have discussed your further points with the Borough Solicitor and have concluded that there is no reason for me to change the Council's position on the matter.

I understand that you take a different view on the issue and that you intend to pursue your complaint with the LGO.

Regards
Sean Harriss Chief Executive

Thursday 13 June 2013

Tesco at Little Lever. My reply to Sean Harriss








DER0679272 – Your response to my Appeal



Dear Mr Harriss,

Thank you for your consideration of my appeal and the detail of your reply.

I must comment before proceeding in a different direction.

I am extremely surprised that the legal department seems to have suggested to you that so long as all the owners have been notified before the application reaches a point of decision, be it by the Planning Committee or in this case eventually the Director, then everything complies with procedures and the law – thus implying that it doesn’t really matter whether the original Certificate is accurate or not. This is an obvious nonsense.

The legal case hinges on the deficiency of the Certificate B submitted with the application.

That Certificate was clearly deficient the day it was submitted and is deficient to this day.

Had this deficiency remained unknown to the Council then there could be no maladministration by them.

However that deficiency did become known to the Council.

The Court of Appeal ruling in the case of Main v Swansea City Council was precisely about the consequences of deficiencies in the original Certificate but that ruling (apart from dealing with the specific circumstances of that case) also laid out a general interpretation of the consequences of deficiencies.

On careful reading, it is clear that the degree of deficiency in an original Certificate can or may ‘go to the jurisdiction’ – ie the authority of the LA to consider the application at all.

The judgment as to whether it does or not in any specific case can only be made by a Court.

So, if an LA becomes aware of deficiencies, they cannot know whether or not they have jurisdiction and thus cannot logically proceed.

That’s it – top and bottom – front and back.

I don’t want to labour the point, but it may well be that your legal department might want another think about this.

Failing this, I must advise you that I need to proceed to the Local Government Ombudsman for their view.

Yours respectfully

Paul Richardson








Tesco at Little Lever. Reply from the Chief Executive to my Appeal.






Dear Mr Richardson

Appeal against Decision.

I write further to your e-mail of 5th April regarding your complaint about the planning application 86999/11 and your dissatisfaction with the response provided by Tim Hill, Chief Housing and Planning Officer.

Please accept my apologies for the additional time required to complete the investigation into this matter. I have now considered your appeal and summarise the points you raised together with my conclusions below.

As you submitted the complaint to Helen Gorman as Monitoring Officer and as it concerned the interpretation of the law, you expected that it would be considered by her rather than by Tim Hill as head of the department you were complaining about.

Under the Council’s formal complaint5s procedure, initial complaints are investigated by an officer within the service who has not been previously involved with the matter. If the matter required an interpretation of the law, as in this case, then advice would be provided to the investigating officer by one of the Council’s lawyers.

Therefore, as Mr Hill is the Chief Officer with responsibility for planning, I find it was appropriate that he investigated at this stage.

You considered that the actions of officers between 23rd January and early February were at variance with required procedures and the law. You consider that as a result the granted planning permission could have been quashed.

Mr Hill clearly states that he agrees with your timetable of events but that he does not consider that there has been a failure to follow the required procedures or the law.

I appreciate that you disagree and that you hold a different interpretation; you make reference to guidance issued by North Somerset County Council which supports your view and suggest that Bolton Council has not issued similar guidance demonstrates a careless approach.

While I accept that you have a view as to why North Somerset issued the guidance and consider that they were correct to do so, as you have been previously advised, the document to which you refer is not a determination of the law. It is merely guidance based on an interpretation of the law and was not given any weight when referred to in a recent court case.

With regards to your reference to the possibility of the granted permission being quashed, I note that you quote a paragraph extracted from an article in the Law Society Gazette from Sept 1987. This refers to instances where an application is granted without an owner being notified suggesting that a prompt application by that owner to have that permission quashed would be successful.  However reference to the timetable set out in your initial complaint clearly demonstrates that this was not the case here and that all owners had been notified before the application to Planning Committee and therefore prior to permission being granted.

Having fully reviewed the matter and based on advice from the Council’s legal service, I must advise you that I do not agree with your interpretation of what the law requires but uphold the view set out in Mr Hill’s original response. As such, I can find no evidence that officers acted incorrectly and I can find no evidence of maladministration. I do not propose to take any further action therefore.

I trust this clarifies the matter, however, if you are not satisfied with my decision, you may contact the Local Government Ombudsman  ……….. (Phone No, Address  etc)

Yours sincerely

Sean Harriss

Chief Executive.




Thursday 4 April 2013

Tesco at Little Lever - Following the response to my complaint - An appeal to the Chief Executive.







Reference DER0679272.

Formal Complaint of Maladministration against Bolton Council

Dear Mr Harris,

Following Bolton Council’s response in the name of Tim Hill, Chief Housing and Planning Officer to the above complaint, I would now like to appeal to you for your further examination and judgment.

I would first like to explain that having made the Complaint to Mrs Gorman (as the Monitoring Officer) and since the matters concerned involved interpretation of the law, I expected that after investigation it would be she who independently and dispassionately formed a judgment based on her legal knowledge and it would be she who formulated the reply, not the head of the Department I was complaining about.

Notwithstanding the above, I would like to respond to the points made by Mr Hill.

………………………………………………………………………………………………….

Careful reading of my original e-mail will reveal that my Complaint was about the actions taken (or not taken) by the Council between 23rd January and early February 2012 following information of deficiencies in the original Certificate B which I provided to Mr Allen on the 23rd January 2012. I submitted in my Complaint e-mail that the actions taken/ not taken were at variance with required procedures and the law and thus were maladministration.

The subsequent effects on the validity of the Planning Consent were merely consequences (in my view) of that maladministration and not the principal of my complaint.

The further point about the 1900 date allocated to Mr Harris’s letter of the 2nd Feb were merely a correct observation and pointed out what a cynic might construe from this.
…………………………………………………………………………………………..

As further justification for my Complaint, I submit the following.

Point No 1 – Notice dates.

Mr Hill asserts that neither the Act nor the Management Procedure expressly or implicitly fix the date when Notices must be given as predating the submission of the application.

I refute this on the basis of simple logic as follows:-

1)      Certificate B is contained within the prescribed Application Form which is of standard form throughout the country. It appears nowhere else and there is no provision or mechanism whereby it can be submitted elsewhere or at a different time.

2)      An Application Form submitted to a Planning Authority without the Certificate section being completed would be rejected.

3)      Certificate B states:-

 CERTIFICATE OF OWNERSHIP - CERTIFICATE B
Town and Country Planning (Development Management Procedure) (England) Order 2010 Certificate under Article 12

I certify/ The applicant certifies that I have/the applicant has given the requisite notice to everyone else (as listed below) who, on the day 21 days before the date of this application, was the owner (owner is a person with a freehold interest or leasehold interest with at least 7 years left to run) of any part of the land or building to which this application relates.

4)      Thus the Certification states on the Application form that Notice has already been given and consequently it must have predated the submission of the Application form ( if only by a matter of hours up to 21 days)

5)      We must conclude from the above that the requirements of the Act & Procedure, the wording of Certificate B - and there being only one mechanism for submitting a Certificate B (ie the Application Form) that these, together, IMPLY that the Notices must predate the submission. No other conclusion can be reached.

………………………………………………………………………………………………


There can be no purpose for the requisite Notice referred to in Certificate B other than to pre-inform owners of the land(s) / building(s) involved that an application is about to be made.

The form of Notice is prescribed  as :-

Town and Country Planning (Development Management Procedure) (England) Order 2010 NOTICE UNDER ARTICLE 11 OF APPLICATION FOR PLANNING PERMISSION
(Notice 1: This notice is to be printed and served on individuals if Certificate B or C is completed

Notice thus cannot be given by postcard or e-mail etc, it must be on the above form.

Further to this, these Notices must be sent to the owner(s) even if those people already are aware of the proposed application.

The wording on the Notice is quite clear in its meaning.

“Take notice that application is being made by …………….For planning permission to………Local Planning Authority to whom the application is being submitted……”

All in the present tense! It does not say “has been made” or “has been submitted

This reinforces the by now clear requirement that the Notices must predate the Application.

………………………………………………………………………………………………

The ability of the applicant to complete Certificate B requires that he/she identifies who are the owner(s) of the land/ building(s) on the prescribed date of 21 days before the application submission.

In reality this would mean taking reasonable steps to do so. The most obvious and reasonable step to take would be to examine the Title Register and Plan of the land involved which is available from the Land Registry online at £8 a throw.

If any part of the land was not registered and the owner could not be identified, there is a separate prescribed procedure in the Act to be followed. This does not apply in the case of 86999/11.
…………………………………………………………………………………………….

Now let us examine what actually happened.

The Application (subsequently 86999/11) was filled in and dated 7th Oct 2011.

The land involved in the Application was the Bradley Mill site, Crossley St and the Tree Plot south of and adjacent to Crossley St.

Certificate B identified the owners of the land as twofold – Mark and Linda Seddon and Bolton Council Estates and stated that Notices had been sent to these also on the 7th Oct.

So the Certificate is saying that these people between them owned the land involved in the development 21 days prior to 7th October  (ie 16th Sept 2011).

The applicant, within the application, submitted a copy of the Land Registry Title Register for Bradley Mill (GM 370984). This shows the owners of Bradley Mill as Mark and Linda Seddon with no lenders or charges against the land.

It is assumed that the applicant relied upon this register as identifying the owners as the above for the purposes of Certificate B.

However, this document is dated 26th October 2010.

I have a copy of GM370984 dated 7th Feb 2011 which now shows a charge against the land in the name of Wayne Seddon. This charge had been laid on the 20th Dec 2010.

I have a further copy of GM 370984 dated 23rd of January 2012 which shows that charge still extant.

It is thus clear that the applicant failed to re-check the Land Registry as he/she was filling in Certificate B on 7th Oct 2011 to see if there had been any changes and thus in fact had had not taken the very reasonable and simple check to identify the owners as at 16th Sept 2011. He/ she was stating something which he could not have known to be true.

………………………………………………………………………………………………

In relation to Crossley St and the Tree Plot, I have no information as to whether the applicant checked the ownership of this land as at 16th Sept 2011. It is not difficult to surmise that he just assumed all this land was owned by the Council – indeed it seems not to have occurred to the Council that they might not own all the land.

Again a simple check on 16th Sept 2011 with the Land Registry would have revealed on the appropriate Title Plan that the north half of Crossley St was in fact owned leasehold by Bolton at Home. They had registered their ownership on 27th August 2011.

So, again, a check had not been made by the applicant as to who owned this part of the land as of 16th Sept 2011.

………………………………………………………………………………………………

Because of this failure to check both of the above, the applicant couldn’t have and didn’t truly know the owners of all the land involved in the application as of 16th Sept 2011 yet stated that he did and certified that he had served Notices on ALL the owners of the land.

Failure to make these checks thus cannot be described as having taken ‘reasonable steps’ and it is basically as a consequence of this that the actions/ lack of actions of the Planning department between 23rd Jan 2012 and early February 2012 are the subject of my complaint.

……………………………………………………………………………………………..

It is clear that at this stage in my argument the Certificate B submitted by the applicant on 17th Oct 2011 was deficient in two respects.

1)      Not all of the owners of the land involved had been given notice.
2)      The applicant had not ascertained who the owners of the land were as at 16th Sept 2011 (21 days before the application as required) but certified that he had and had issued Notices to them.
………………………………………………………………………………………………

From receipt of the Application until 23rd January 2012, Bolton Council Planning was unaware of these deficiencies. There is no procedure (or requirement) for the Council to double check who the owners are (perhaps there ought to be). They take on face value that what the applicant has certified is true and correct. Validation took place and the application progressed without any fault on the part of the Council.

Had I not (for different reasons) informed Mr Allen of the deficiencies on 23rd January then the application could have proceeded to decision without anyone being the wiser.
………………………………………………………………………………………………

However, Mr Allen did become aware of these deficiencies on 23rd January and the question then arose ‘what ought he to do about it and what did the law require him to do about it?

……………………………………………………………………………………………..

In his e-mail of 30th January 2012 to the applicants agent Mr Allen  acknowledged :- (quote) 

In any event the Certificate of Ownership is a legal requirement and therefore needs to be accurate otherwise any future planning decisions could reasonably be challenged.”

The agent then wrote back to Mr Allen with the information that Notices had been served to the additional persons on 2nd February.

Bolton Planning plainly accepted that this was a legitimate way of correcting the deficiencies in the original Certificate, everything in the garden was rosy and the application could proceed.

…………………………………………………………………………………………………… 

I contend that the deficiencies could not be corrected in this way. The Certificate remained in its original state and remained deficient in not listing all the owners of the land as of 16th Sept 2011.

These additional Notices (presumably sent on the pro-forma No 1) were sent nearly four months after submission of the application and could not therefore satisfy the requirement (which I hope I have successfully argued and demonstrated above) of being sent before submission of the application.

Bolton Planning (being professional planners) should have realized and recognized this and ,irrespective of the embarrassment and inconvenience to the applicant, should have advised the applicant that the situation could only be remedied by starting all over again with a new or re-submitted application form where Certificate B was correct, without deficiencies and thus satisfied the requirements of the Act.

Failure to do this is the complete substance of my Complaint of maladministration.

……………………………………………………………………………………………………..

I now draw your attention to further assertions in Mr Hill’s reply.

He states:-

“In relation to the validity of the Certificate of Ownership and the lawfulness of the current planning permission (Ref: 86999/11), this is a matter which is ultimately for the Court through the established process of judicial review.”

I completely accept that lawfulness of the current planning permission would be (have been) ultimately for a Court to decide. Case law shows that the Court has discretion in measuring the effect on that lawfulness of a deficient Certificate by making a judgement on the degree or seriousness of that deficiency and other factors - resulting in a range of possible decisions from dismissal of the appeal to declaring the planning consent unlawful.

Perhaps I should have been less definite in asserting that the planning consent 86999/11 was unlawful.

All this does not alter, or is directly connected to, the substance of my complaint.
…………………………………………………………………………………………………..

Mr Hill further draws my attention to the Case of R(on the application of O’Brien) v West Lancashire BC (2012).

I am unable to access (without cost) the full details of this case, but a summary appearing in

“Planning, Local Government & Administrative Law Case Update July 2012 by Mark C. Mohammed, Advocate”


reveals that the Court referred to what seems to be the definitive Case Law for this type of situation, ie – the Court of Appeal decision in the case of Main v. Swansea City Council

Since this was a Court of Appeal decision, the Court involved in R v West Lancashire was bound by it – not just to use it as a reference point.

The ramifications of this case are perhaps best revealed in the following document from the Law Society Gazette. This is too long to be reproduced here but can be found at :-




The whole document might make interesting reading for Mr Hill.

I quote the following passage from the above which I think is most relevant in this case.

The Court of Appeal held that whilst a factual error in a certificate may be no more than an irregularity that does not go to the jurisdiction, it was unable to accept that all factual errors would be categorised as mere irregularities unless it is so gross as to make the certificate no certificate at all.

The Court stressed that it was the responsibility of the applicant to ascertain and give notice to all owners if he can do so and, if he cannot do so, then to advertise the application in the local paper. If an applicant, honestly but negligently, failed to do this so that an application is granted without an owner being notified or advertisement made then the court could not see why a prompt application by the owner concerned to have the permission quashed should not succeed.

It is clear that factual errors in a certificate could affect the jurisdiction of the LA to deal with the application.

It is not the business or competence of the LA to make that judgment – it is a matter for the Court.

Thus, upon learning of factual errors in the Certificate, the only course for the LA (since they no longer know if they have jurisdiction or not) would be to stop work on the Application and advise the Applicant that a re-submission with a correct Certificate was required.

The second quoted paragraph is quite clear that in the case of 86999/11 the granted permission could have been quashed since it is equally clear that the Applicant negligently failed to take reasonable steps (albeit perhaps honestly) to ascertain the Owners as of 16th Sept 2011

It is clear to me that it is because of all the above that North Somerset issued the Guidance that they did and were correct to do so.

The fact that Bolton Council hasn’t issued similar guidance together with Mr Hill’s insistence that it is irrelevant, betrays a somewhat cavalier attitude to that which procedures and the law require.

To further clarify North Somerset’s bases for issuing this guidance I have written to them for an explanation.


……………………………………………………………………………………………………..
Summary:-

Upon discovering the factual errors in the Certificate, Bolton Council could no longer know if they had the jurisdiction to progress the Application.

Without this knowledge of jurisdiction and in accepting the concept of Additional Notices four months after the Application had been submitted and thus allowing the application to progress, Bolton Council failed conform with correct procedures and the requirements of the Law and are thus guilty of Maladministration.

…………………………………………………………………………………………………..

Final note:-

It may well be that the horse has bolted and it’s too late to legally shut the door in the case of this application, but you must know that from the start there was obviously an imperative for this application to succeed. Rules have been bent in this matter and other parts of the application’s progress. This strikes at the integrity of the Planning Process.

I am sure you agree that the Planning Process should be dispassionate and ( as Caesar’s wife) beyond reproach – just as much in the case of a large multinational company as it would be for Mr Smith’s house extension.

Ok – nothing much can be done and there are no real consequences, but should you agree, a mere admission that the Planning Department was wrong wouldn’t be amiss.

Should you reject my Complaint, I will take it to the Local Government Ombudsman.

Yours sincerely and respectfully


Paul Richardson.